SW Louisiana Gas Treating Project,

This standard 80 GPM Amine Gas Treating Unit was initially installed in 2002 at a Vermillion Parish, LA location to treat 15.0 MMscf/d using a 30% DEA solution and a treat / bypass / blend flow scheme for CO2 removal.  This equipment is provided on a flat fee per month equipment lease with maintenance preformed by Gas Processors, Inc.